Top Navigation Bar

@*土石流及大規模崩塌防災資訊網logo圖片*@ Debris Flow and Large-Scale Landslide Disaster Prevention Information Network logo image @*土石流及大規模崩塌防災資訊網名稱圖片*@ Debris Flow and Large-Scale Landslide Disaster Prevention Information Network name image
Debris Flow and Large-Scale Landslide Disaster Prevention Information Network

應變開設專區

0814豪雨土石流及大規模崩塌災害緊急應變小組 級開設 未來48小時紅黃警戒推估

警戒統計資訊

紅色警戒

  • 0
    土石流潛勢溪流
  • 0
    縣市
  • 0
    鄉鎮
  • 0
    村里
  • 0
    大規模崩塌潛勢區
  • 0
    縣市
  • 0
    鄉鎮
  • 0
    村里

黃色警戒

  • 0
    土石流潛勢溪流
  • 0
    縣市
  • 0
    鄉鎮
  • 0
    村里
  • 0
    大規模崩塌潛勢區
  • 0
    縣市
  • 0
    鄉鎮
  • 0
    村里

警戒地圖與縣市列表

桃園市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
新竹縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
苗栗市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
臺中市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
彰化縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
雲林縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
嘉義縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
臺南市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
新北市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
高雄市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
臺北市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
基隆市
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
宜蘭縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
南投縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
花蓮縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
臺東縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒
屏東縣
土石流警戒 0 0
大規模崩塌警戒 0 0
目前無發布任何警戒

Disaster Potential

·

Warning Threshold Setting Method

Method for Setting Debris Flow Warning Threshold
Debris Flow Warning Threshold
Debris flow warning threshold (rainfall criteria for debris flow warning) utilizes rainfall data from the Central Weather Administration, using the effective accumulated rainfall(Rt) and rainfall intensity(I) as the product of two rainfall parameters for the Rainfall Trigger Index(RTI), and based on the reference rain gauge stations near the debris flow potential streams, calculates the debris flow rainfall warning threshold(RTI 70) (the subscript number represents the possibility of debris flow occurrence).
@*降雨驅動指標*@Rainfall Trigger Index
Rainfall Trigger Index
Simplified Method
  1. Based on the RTI values calculated from historical rainfall events, use RTI70 (70%) as the benchmark.
  2. Under the condition of rainfall intensity I = 10 mm/hr, the debris flow accumulated rainfall warning threshold R70 is inferred from the Rainfall Trigger Index threshold RTI70.
  3. Set 50mm as 1 grade interval, setting the debris flow warning threshold range with 200mm as the lower limit and 650mm as the upper limit (a total of 10 grade intervals).
To facilitate public understanding and implementation of debris flow policies, starting from 2004 (Year 93 of the Republic of China calendar), under the condition of rainfall intensity I = 10 mm/hr, the debris flow warning threshold was simplified to Rc=R70, which uses effective accumulated rainfall as the debris flow occurrence warning indicator. The warning thresholds for all of Taiwan are set with an interval of 50 mm for each grade, serving as a reference for various regions to determine the timing for debris flow disaster prevention, evacuation, and shelter.
@*有效累積雨量介紹*@Introduction to Effective Accumulated Rainfall
Introduction to Effective Accumulated Rainfall
Routine Update of Debris Flow Warning Threshold
★ Standard Operating Procedure for Debris Flow Warning Threshold Update
★ Routine Update of Debris Flow Warning Threshold
The routine review cycle is generally once a year, with the submission time generally scheduled between the end of the flood season and the start of the next flood season each year. The factors considered for the routine update of the debris flow warning threshold include areas with no recorded sediment disaster and no adjustments in the past five years, new rainfall events, new debris flow events, and the general condition of environmental changes in the debris flow warning zones. The definitions of the aforementioned adjustment factors are as follows:
  1. Areas with New Sediment Disaster Events: Areas where sediment events occurred after the last warning threshold update but did not cause a disaster should still be evaluated for the necessity of a warning threshold adjustment.
  2. Areas with Slopeland Environmental Changes in Debris Flow Catchment Areas or Areas Assessed for Adjustment: Although no new debris flow or earthquake events have occurred in the area, if there are significant environmental changes in the catchment area (e.g., landslides caused by rainfall), or if an adjustment is deemed necessary after evaluation of new rainfall events, the debris flow warning threshold should be reviewed.
  3. Areas Where Warning Threshold Was Reduced Due to Earthquakes: For specific areas where the warning threshold was reduced due to an earthquake (and has not yet been restored to the original value), the new earthquake events and disaster occurrence should be re-evaluated annually to review the debris flow warning threshold.
  4. Areas with No Recorded Sediment Disaster and No Adjustment in the Past Five Years: Warning zones with no recorded sediment disaster and no warning threshold adjustment for five years or more must compare the current warning threshold with the analysis results of historical rainfall events. Locations where the difference between the current warning threshold and the analysis result is too large should be included in the routine review.

★ Immediate Review of Debris Flow Warning Threshold
  1. New Major Sediment Disaster Events: For areas where complex disaster events such as large-scale landslides and debris flow disasters occurred in the catchment area due to events like Typhoon Morakot in 2009 (Year 98 of the Republic of China calendar), immediate adjustment recommendations for the debris flow warning threshold should be proposed based on the situation in each affected area.
  2. Areas Affected by Earthquakes with Intensity 5 Strong or Higher (new earthquake events where the Peak Ground Acceleration (PGA) is above 80 gal and the Peak Ground Velocity (PGV) is above 30 cm/sec): Adjustment recommendations for the debris flow warning threshold should be proposed based on the situation in each affected area.
  3. Newly Added Debris Flow Potential Streams: If the newly added stream is within an existing debris flow warning zone, the need to update the current debris flow warning threshold should be reviewed, and updated immediately if necessary. If it is not part of an existing debris flow warning zone and needs to be newly added, the debris flow warning threshold should be set based on historical rainfall data, debris flow occurrences, and geomorphological data.

★ Operational Procedure for Debris Flow Warning Threshold Increase
  1. Areas with Earthquake Intensity 5 Strong: If, after the earthquake, the area experiences at least 1 typhoon/heavy rain event (within 5 years) where the effective accumulated rainfall exceeds the warning threshold, and there is no record of sediment disaster and the slope environment has improved, the warning threshold shall be raised back to the original value.
  2. Areas with Earthquake Intensity 6 Weak (or higher): If, after the earthquake, the area experiences at least 3 typhoon/heavy rain events (within 5 years) where the effective accumulated rainfall exceeds the warning threshold, and there is no record of sediment disaster and the slope environment has improved, the warning threshold shall be raised back to the original value (the adjustment is generally carried out in 2 stages: after at least 2 rainfall events reaching the warning threshold after the earthquake, it can be raised by 1 to 2 grades; after a total of 3 or more rainfall events reaching the warning threshold after the earthquake, it will be raised back to the original value).
  3. Areas where the warning threshold has been reduced due to an earthquake for 5 years or more: If there is no record of sediment disaster and the slope environment has been restored, the warning threshold shall be raised back to the original value.
  4. General Review: When an area has experienced at least 3 or more rainfall events where the effective accumulated rainfall exceeds the warning threshold in the past, with no record of sediment disaster and improved slope environment; or if 5 years have passed since the disaster occurred with no record of sediment disaster during this period, the warning threshold shall be raised back to the original value. However, in areas that have experienced severe sediment disasters, a more conservative, phased approach to adjustment may be adopted.
@*指降雨量大於警戒值之事件*@Refers to rainfall events where the rainfall amount is greater than the warning threshold
The rainfall events mentioned in the text in the figure refer to events where the rainfall amount is greater than the warning threshold

  1. Estimate the specific debris flow warning thresholds (e.g., R70, R60, and R50) for each warning zone across Taiwan based on rainfall data from the reference stations in the debris flow warning zones and records of debris flow occurrences.
  2. If a debris flow potential stream's catchment area experiences landslides due to rainfall or has a history of sediment disasters, the warning threshold should be estimated based on geomorphological indicators and compared with the specific debris flow warning thresholds estimated by the aforementioned rain gauge stations (using R50 as the basis). A recommendation for a debris flow warning threshold reduction should be proposed, and appropriate adjustments can be made based on the severity of the disaster.
  3. In the event of an earthquake with intensity 5 strong, the warning threshold can be reduced based on R60 after analysis and evaluation (a reduction of about 1 to 2 grades). If the earthquake intensity reaches 6 weak (or higher), the warning threshold can be immediately reduced based on R50 after evaluation (a reduction of 2 to 4 grades).
  4. For townships/districts where the warning threshold has been reduced due to an earthquake, the debris flow warning threshold will be maintained if no earthquake with an intensity higher than the original reduction intensity occurs before it is raised back to the original value. If the intensity is higher than the original reduction intensity, the warning threshold will be reviewed again.
  5. For the same township/district where the warning threshold has been reduced due to an earthquake or sediment disaster, if a disaster or earthquake event occurs again in the short term, the current warning threshold and the adjusted value must be compared and analyzed to prevent the warning threshold from being repeatedly reduced.
@*土石流警戒基準值調降作業流程*@Operational Procedure for Debris Flow Warning Threshold Reduction
Emergency adjustment of the warning threshold during the flood season can be made based on the on-site situation after the disaster and is not limited by this procedure
References (Delete before official launch)

Method for Setting Debris Flow Warning Threshold https://246.ardswc.gov.tw/Info/Debris_Function

Presentation P18 Method for Setting Debris Flow Warning Threshold ~ P22 Principles for Debris Flow Warning Threshold Update https://246.ardswc.gov.tw/Service/DownloadTeachCase

Historical Debris Flow Warning Thresholds https://246.ardswc.gov.tw/Service/DownloadDebrisThreshold

頁面頂端

分享與工具列